News
Abdul Wali Khan University (AWKU), Mardan
June 28, 2011
Designing, implementation & configuration of Fiber, Active & Passive along with Complete Data Center Design, including Imported Racks, PDUs, Cooling System, Power Analysis & Design, UPSs & Generator for Data Center Only, Automatic Cooling Control System, Environment Monitoring System, Fire Proof Ceiling, Paint & Glass Work, Access Control, Cable Management (Trays & Ladder) & Raised Flooring. Active equipment of Cisco Router 3925, Firewall 5520, Cisco 4900 Series Core Layer 3 Switch along with Layer 2 - 2900 Series Switches. All Site Campuses will be equipped with 6kVA UPS with 1 hour backup time for Computer Labs.
National Investment Trust (NIT), Lahore
March 15, 2011
Complete installation, commissioning and configuration of data center & distribution power and passive cabling. Infrastructure includes: Civil Work (Data Center Room), Fire Proof Flooring, Fire Proof Glass, Fire Proof Paint, Environment Monitoring System, Auto Precision Cooling System.
Crescent Bauhman Limited, Lahore
October 10, 2010
Complete installation, commissioning and configuration of data center networking, power and data infrastructure. Infrastructure equipment includes: 10kVA UPS, Raised Flooring for 12x11 ft room, Cable Trays, Fire Suppression System, Environmental Control System, Power DB, Racks and other accessories.
National Database And Registration Authority
January 25, 2011
Designing, implementation & configuration of Networking & Power works at 57 Nadra sites approx. 700 Networking nodes all over Punjab along with Supply of 1.4/1.5kVA Line Interactive UPS with standard backup time.
Oil And Gas Development Authority, Islamabad
May 19, 2010
Supply of 2 Nos. 20kVA 3 phase Online UPS with 1 hour backup time.
WAPDA Telemetry Project
March 20, 2008
Supply & installation of 10 Nos. 10kVA Low Frequency Transformer based UPS at all Dams in Pakistan.
Frontier Women University (FWU), Peshawar
April 25, 2011
Designing, implementation & configuration of Fiber, Active & Passive along with Complete Data center Design, including Racks Configuration, Power Analysis & Design. Supplied & Configured Equipment of Cisco 4900 Series Core Layer 3 Switch along with Layer 2 - 2900 Series Switches, Wireless Routers & Access Points.
Pakistan Revenue Automation (Pvt.) Limited
June 04, 2010
Supply, installation and commissioning of complete data center power infrastructure along with cooling, cable management, panel work and supply of 2 Nos. 60kVA 3 phase Online UPSs running in parallel with standard backup time, 100kVA Generator, 4 Nos. Precision Cooling Units, Power distribution panels and complete power wiring for Islamabad Disaster Recovery Site.
National Textile University, Faisalabad
Aril 22, 2010
Complete setup of campus LAN over 500 network nodes with active & passive configuration and termination. Supply & installation of 2 Nos. 20kVA 3 Phase Online UPS running in parallel with 1 hour backup time in data center, 1 No. 10 kVA three phase & 10 Nos. 1kVA UPSs with standard backup time.
Nestle Pakistan Limited
June 23, 2009
Supply and installation, configuration and commissioning of Sheikhupura Factory Data Center consisting of 150 Network Nodes, Raised Flooring, 2 Nos. 20kVA 3 phase Online UPS running in parallel with standard backup time and Cable Management System.
Sui Northern Gas Pipelines Limited
May 28, 2010
Supply, Installation and configuration of 2 Nos. 10kVA UPS running in parallel and hot standby mode with 4 Hours backup time installed at SCADA System in SNGPL Faisalabad Telecom Data Center.
Islamia University Bahawalpur
May 20, 2009
Supply & installation of Cisco Aironet Wireless Bridges & Other IT Equipment for complete wireless networking in the campus.