News

Abdul Wali Khan University (AWKU), Mardan

June 28, 2011

Designing, implementation & configuration of Fiber, Active & Passive along with Complete Data Center Design, including Imported Racks, PDUs, Cooling System, Power Analysis & Design, UPSs & Generator for Data Center Only, Automatic Cooling Control System, Environment Monitoring System, Fire Proof Ceiling, Paint & Glass Work, Access Control, Cable Management (Trays & Ladder) & Raised Flooring. Active equipment of Cisco Router 3925, Firewall 5520, Cisco 4900 Series Core Layer 3 Switch along with Layer 2 - 2900 Series Switches. All Site Campuses will be equipped with 6kVA UPS with 1 hour backup time for Computer Labs.


National Investment Trust (NIT), Lahore

March 15, 2011

Complete installation, commissioning and configuration of data center & distribution power and passive cabling. Infrastructure includes: Civil Work (Data Center Room), Fire Proof Flooring, Fire Proof Glass, Fire Proof Paint, Environment Monitoring System, Auto Precision Cooling System.


Crescent Bauhman Limited, Lahore

October 10, 2010

Complete installation, commissioning and configuration of data center networking, power and data infrastructure. Infrastructure equipment includes: 10kVA UPS, Raised Flooring for 12x11 ft room, Cable Trays, Fire Suppression System, Environmental Control System, Power DB, Racks and other accessories.


National Database And Registration Authority

January 25, 2011

Designing, implementation & configuration of Networking & Power works at 57 Nadra sites approx. 700 Networking nodes all over Punjab along with Supply of 1.4/1.5kVA Line Interactive UPS with standard backup time.


Oil And Gas Development Authority, Islamabad

May 19, 2010

Supply of 2 Nos. 20kVA 3 phase Online UPS with 1 hour backup time.


WAPDA Telemetry Project

March 20, 2008

Supply & installation of 10 Nos. 10kVA Low Frequency Transformer based UPS at all Dams in Pakistan.

Frontier Women University (FWU), Peshawar

April 25, 2011

Designing, implementation & configuration of Fiber, Active & Passive along with Complete Data center Design, including Racks Configuration, Power Analysis & Design. Supplied & Configured Equipment of Cisco 4900 Series Core Layer 3 Switch along with Layer 2 - 2900 Series Switches, Wireless Routers & Access Points.


Pakistan Revenue Automation (Pvt.) Limited

June 04, 2010

Supply, installation and commissioning of complete data center power infrastructure along with cooling, cable management, panel work and supply of 2 Nos. 60kVA 3 phase Online UPSs running in parallel with standard backup time, 100kVA Generator, 4 Nos. Precision Cooling Units, Power distribution panels and complete power wiring for Islamabad Disaster Recovery Site.


National Textile University, Faisalabad

Aril 22, 2010

Complete setup of campus LAN over 500 network nodes with active & passive configuration and termination. Supply & installation of 2 Nos. 20kVA 3 Phase Online UPS running in parallel with 1 hour backup time in data center, 1 No. 10 kVA three phase & 10 Nos. 1kVA UPSs with standard backup time.


Nestle Pakistan Limited

June 23, 2009

Supply and installation, configuration and commissioning of Sheikhupura Factory Data Center consisting of 150 Network Nodes, Raised Flooring, 2 Nos. 20kVA 3 phase Online UPS running in parallel with standard backup time and Cable Management System.


Sui Northern Gas Pipelines Limited

May 28, 2010

Supply, Installation and configuration of 2 Nos. 10kVA UPS running in parallel and hot standby mode with 4 Hours backup time installed at SCADA System in SNGPL Faisalabad Telecom Data Center.


Islamia University Bahawalpur

May 20, 2009

Supply & installation of Cisco Aironet Wireless Bridges & Other IT Equipment for complete wireless networking in the campus.